It was a big Labor Day weekend at 50 Crystal Drive. Last week as the framers were framing the garage addition they noticed a large part of our existing roof was sunken in. After much deliberation, we decided it would be in our best interest to replace the entire existing roof. It was perfect timing to decide to remove our roof over Labor Day weekend because Ryan's brother, PJ and our brother-in-law, Mike were coming in town. We knew removing the roof wasn't going to be easy, but having them in town made the job much easier!
Michael rented an all terrain fork lift to assist with the roof removal. His buddy Rick volunteered his time on Saturday and Sunday to operate the machine. With Michael on top of the roof cutting up shingles, Ryan, PJ, and Mike in the house sawing the studs and jousts, and Rick operating the fork lift, the roof came off by day 3!! These guys are amazing!!
The framers came on Saturday to finish up the garage addition. Now that the roof is gone, the framers can come in this week and frame our new roof. Hopefully the weather stays nice this week, mainly because we no longer have a roof!
 |
| The garage and additions all framed in |
 |
| We started early Saturday morning on taking the old roof off with an all terrain fork lift |
 |
| Michael got out his climbing gear to help with the roof removal |
 |
| Mike and Ryan supervise as Rick pulls off a section of the roof |
 |
| It wasn't long before we filled up the first dumpster with our roof |
 |
| Michael in his climbing gear and brother in law Mike ready to work |
 |
PJ attaching the chain to the fork lift, while Michael lowers down the circular saw
|
 |
PJ using the sledge hammer to loosen up the studs
|
 |
| Ryan pondering the meaning of life while wielding a chain binder |
 |
| There goes the roof...maybe we should just turn this into a roof top deck |
 |
| Father and sons |
 |
| We went through 11 circular saw blades tearing off the roof. The asphalt shingles dulled each blade in no time. |
 |
| We cut up the pieces of roof, chained them to the fork lift, then watched as operator Rick took them away |
 |
| The removal crew: Ryan, Michael, PJ and Mike |
 |
| End of day 1 |
 |
| Stairway to heaven? |
 |
| Michael operating the fork lift, after reading the manual of course!! |
 |
| On Monday morning, after two and a half full days of work, we're almost done. Seeing the second floor with no roof was really weird, can't wait to get it enclosed again. |
 |
| This picture doesn't do justice to just how many pounds of shingles and wood we removed |
 |
| Picture of us from our new roof top deck! |
 |
| Ryan took a turn using the climbing gear on Monday while Michael operated the lift |
 |
| Mike using the sawzall as tar and asphalt fell all over his face....we love you Mike! |
 |
| Ryan cutting out one of the last sections of roof, also feeling very good to be almost done ripping the roof off |
 |
Before and After. We filled an entire dumpster and had plenty left over that we'll need to put in another dumpster. We definitely were not planning on taking off the roof when we started this project, but are really happy that we did it now that the roof is torn off. The new roof will be sturdier and provide us with a good amount of additional room in the second floor. The renovation continues to throw challenges at us, but we are having fun dealing with them and are so lucky that we have family and friends to help us get the job done! We also have to say THANK YOU to the wives of our crew, Sherry, Meghan, and Keri for allowing us to steal away your husbands for the holiday weekend!! It won't happen again ;)
Thanks again Michael, PJ, Mike, and Rick!! You guys are the best! |