Tuesday, January 18, 2011

It's 2011 and the construction continues....

We hope everyone had a fabulous holiday.  Ours was filled with celebrating, eating, and of course working on the house.  It has been so long since our last update and that is primarily because the progress that we have made hasn't been very exciting and also because as the weather gets colder there is not much progress to report.  Especially when snow and freezing rain is in our forecast.  Who knew the winter in Pittsburgh would make for difficult remodeling conditions?!

Since our last update we have shingles on the roof, pillars on the porch, plumbing throughout the house, electric, heating/cooling, insulation and drywall on the second floor and the start of some siding on the exterior.  It has definitely been a challenge for us to sit back and wait for our sub contractors to find the time and motivation to work on our house.  Our patience is wearing thin and we want to complete this project more than ever, so we continue to do the projects we can handle ourselves and encourage the subs to get their part done.

A little glimpse of our December!

Ryan and Michael installing our pillars for the front porch
We hired an insulation team to insulate the second floor.  It was definitely worth having someone else install the insulation after we removed all of the previous insulation from the old house.
A view of the pillars after installation.  We still need to install the white ballisters in between each pillar. 
Remember all of that brick we took down from the back of the house??  Well, we were able to reuse it around the garage and we had enough to patch up areas around the house where the brick had fallen off in the midst of all the demolition.  We plan to paint the existing brick a shad lighter than the fiber cement siding (stay tuned for pics of the siding).
A view of the garage with all of the windows installed.  We were able to reuse the old windows from the back of the house.
The stairway to the second floor covered with DRYWALL!
The master bedroom with the drywall installed!!  It is so crazy to see the second floor with WALLS!!
Master bath - the green drywall is meant to resist humidity (i.e. shower steam) and the grey dry wall is cement board for tile
Another view of the master bath with drywall
The middle bedroom
A view of the hallway with walls!!
The third bedroom on the end
Another view of the third bedroom