Since our last update we have shingles on the roof, pillars on the porch, plumbing throughout the house, electric, heating/cooling, insulation and drywall on the second floor and the start of some siding on the exterior. It has definitely been a challenge for us to sit back and wait for our sub contractors to find the time and motivation to work on our house. Our patience is wearing thin and we want to complete this project more than ever, so we continue to do the projects we can handle ourselves and encourage the subs to get their part done.
| We hired an insulation team to insulate the second floor. It was definitely worth having someone else install the insulation after we removed all of the previous insulation from the old house. |
| A view of the pillars after installation. We still need to install the white ballisters in between each pillar. |
| A view of the garage with all of the windows installed. We were able to reuse the old windows from the back of the house. |
| The stairway to the second floor covered with DRYWALL! |